Skip to content
--:--:----/--/----
Art Floor
All projects

Villa in Rosh HaAyin

Location
Rosh HaAyin
System
Microtopping over old, cracked tiles, with a fibreglass-mesh base coat

A 50-year-old villa in Rosh HaAyin, about 90 m². The floor was old, cracked tiles, with some parquet and old concrete.

Before the microtopping we applied a base coat with fibreglass mesh to bridge the cracks and keep them from showing through.

On top we applied 3 mm Spanish microtopping in concrete grey — one continuous floor from the kitchen through the living room to the dining area, with no demolition and no debris.

Villa in Rosh HaAyin

Work video

Full disclosure: all videos were shot and edited by Avshi Sapir — home, non-professional filming and editing.

Gallery

Tell us what you have today, and we'll tell you what's possible.

Send a few details — or a WhatsApp photo of your current floor — and Avshi will get back to you with an initial estimate and arrange a visit.

Home page